• Skip to main content
  • Jump to navigation
  • Search

Page Outlines

Loading...

    Globe

    IE10 and below are not supported.

    Google Chrome Mozilla Firefox

    Contact us for any help on browser support

    You are here:

    • Home
    • Aurora Reservoir Access Road Study

    Alternatives with Image Descriptions

    Graphic of Alternative 5: Extension of Whitaker Drive/Belleview Ave
    previous next
    [Image description: Map of Alternative 5, which is a 22-foot roadway with a 10-foot sidewalk. Pros -Powhaton Road can remain to provide a secondary, emergency use only access -All access to the park may now be controlled through the entry station pending alignment -The longer road length minimizes vehicle backup onto Harvest Road on high volume park use days -The existing topography is suitable for a new road, allowing the design to meet slope standards with minimal grading -Reduces impacts to open space and allows for critical habitat including travel corridor of the American Pronghorn to remain in its current state Cons -This alternative runs through Cherry Creek School District and Arapahoe County owned property and will require easements or right-of-way -Roadway shares access to school bus and staff parking lots Estimated construction costs Alternative 1: $11,900,000 Alternative 2: $7,660,000 Alternative 3: $7,180,000 Alternative 4: $6,400,000 Alternative 5: $6,100,000]
    Graphic of Alternative 1: Extension of Orchard Road
    Graphic of Alternative 2: Extension of Alexander Drive
    Graphic of Alternative 3: Turns Northbound Off Alexander Drive
    Graphic of Alternative 4: East of Powhaton Road
    Graphic of Alternative 5: Extension of Whitaker Drive/Belleview Ave