Build Up Aurora
In 2023, the city delivered on promises to address a top priority of our residents—transportation and roadways—by improving the condition of Aurora’s residential streets. All of the scheduled paving work is now complete.
According to national standards, the condition of 58% of the city’s overall street network, including neighborhood streets, was rated as fair or below leading up to the start of this project. The Aurora City Council approved a plan to fund the neighborhood improvements—ranging from concrete repair to street reconstruction—to bring the city’s overall street network back to good condition, especially neighborhood streets.
Rehabilitation roadwork happened this year in 35 neighborhoods with the greatest need for improvement. The project began with concrete repair, followed by paving work. Individual projects were prioritized based on the severity of street conditions.
View the 2022-23 neighborhood street rehabilitation map.
Residential streets citywide will continue to be part of Aurora’s annual roadwork, with a continued focus on caring for what we have. A map of the planned work for 2024 and a newly updated five-year plan map will be posted in early 2024.
View the recent news coverage on Build Up Aurora's progress this year:
Denver Gazette Article: Aurora project to fix neighborhood roads makes progress, draws praise
CBS Colorado: Aurora residents see improvements on neighborhood streets
In 2023, the city delivered on promises to address a top priority of our residents—transportation and roadways—by improving the condition of Aurora’s residential streets. All of the scheduled paving work is now complete.
According to national standards, the condition of 58% of the city’s overall street network, including neighborhood streets, was rated as fair or below leading up to the start of this project. The Aurora City Council approved a plan to fund the neighborhood improvements—ranging from concrete repair to street reconstruction—to bring the city’s overall street network back to good condition, especially neighborhood streets.
Rehabilitation roadwork happened this year in 35 neighborhoods with the greatest need for improvement. The project began with concrete repair, followed by paving work. Individual projects were prioritized based on the severity of street conditions.
View the 2022-23 neighborhood street rehabilitation map.
Residential streets citywide will continue to be part of Aurora’s annual roadwork, with a continued focus on caring for what we have. A map of the planned work for 2024 and a newly updated five-year plan map will be posted in early 2024.
View the recent news coverage on Build Up Aurora's progress this year:
Denver Gazette Article: Aurora project to fix neighborhood roads makes progress, draws praise
CBS Colorado: Aurora residents see improvements on neighborhood streets
Please feel free to submit your question to us.
-
Share With the rapid building of new apartment complexes around southlands and new home constructions in Copperfield community the single lane Gun Club Road is extremely congested in the rush hours. Why is this road not being considered for expansion? I live in Tollgate crossing and have to frequently make trips to Anschutz Medical, shopping in central Aurora & Beck Rec Center. There is no alternate road for me to take other than Gun Club Road to go north of the city. Compared to any other major streets (Buckley/Hampden/Quincy/Chambers all have 6 lanes) why is Gun Club road not being prioritized for expanded before these major housing expansion? Thanks for your feedback. on Facebook Share With the rapid building of new apartment complexes around southlands and new home constructions in Copperfield community the single lane Gun Club Road is extremely congested in the rush hours. Why is this road not being considered for expansion? I live in Tollgate crossing and have to frequently make trips to Anschutz Medical, shopping in central Aurora & Beck Rec Center. There is no alternate road for me to take other than Gun Club Road to go north of the city. Compared to any other major streets (Buckley/Hampden/Quincy/Chambers all have 6 lanes) why is Gun Club road not being prioritized for expanded before these major housing expansion? Thanks for your feedback. on Twitter Share With the rapid building of new apartment complexes around southlands and new home constructions in Copperfield community the single lane Gun Club Road is extremely congested in the rush hours. Why is this road not being considered for expansion? I live in Tollgate crossing and have to frequently make trips to Anschutz Medical, shopping in central Aurora & Beck Rec Center. There is no alternate road for me to take other than Gun Club Road to go north of the city. Compared to any other major streets (Buckley/Hampden/Quincy/Chambers all have 6 lanes) why is Gun Club road not being prioritized for expanded before these major housing expansion? Thanks for your feedback. on Linkedin Email With the rapid building of new apartment complexes around southlands and new home constructions in Copperfield community the single lane Gun Club Road is extremely congested in the rush hours. Why is this road not being considered for expansion? I live in Tollgate crossing and have to frequently make trips to Anschutz Medical, shopping in central Aurora & Beck Rec Center. There is no alternate road for me to take other than Gun Club Road to go north of the city. Compared to any other major streets (Buckley/Hampden/Quincy/Chambers all have 6 lanes) why is Gun Club road not being prioritized for expanded before these major housing expansion? Thanks for your feedback. link
With the rapid building of new apartment complexes around southlands and new home constructions in Copperfield community the single lane Gun Club Road is extremely congested in the rush hours. Why is this road not being considered for expansion? I live in Tollgate crossing and have to frequently make trips to Anschutz Medical, shopping in central Aurora & Beck Rec Center. There is no alternate road for me to take other than Gun Club Road to go north of the city. Compared to any other major streets (Buckley/Hampden/Quincy/Chambers all have 6 lanes) why is Gun Club road not being prioritized for expanded before these major housing expansion? Thanks for your feedback.
Farid asked about 1 year agoThank you for reaching out. Improvements to Gun Club Road to the south of Quincy Avenue and the bottleneck it creates have been identified as a priority for the South Aurora Regional Improvement Authority (SARIA). SARIA is a quasi-governmental entity consisting of metro districts in southeast Aurora and the Aurora Public Works Department that was established to fund necessary regional transportation improvements that are not tied to development and would otherwise have no funding source.
The portion of Gun Club Road from Aurora Parkway to Quincy Avenue is almost entirely within the jurisdiction and the responsibility of Arapahoe County. However, the SARIA board recognized the benefit of its improvement to the residents of Aurora and entered into an agreement with Arapahoe County to share the cost of preliminary design of the project. Preliminary design was recently completed. To ask questions specifically of Arapahoe County, please call the county's Public Works Department at 720.874.6500.
Aurora received grant funding to complete final design for the widening of Gun Club Road from Aurora Parkway to Quincy Avenue in addition to multimodal improvements. This project will begin in 2025 and is expected to be completed in 2027. Construction funding has not been identified at this time; however, the city, county and SARIA have agreed to work in good faith to identify funding sources for construction.
The portion of Gun Club Road to the north of Quincy Avenue is a part of the state highway system and is the Colorado Department of Transportation’s responsibility with regard to operations, maintenance and improvement. The city is involved in regular discussions with CDOT regarding the priority of widening Gun Club Road but there currently isn’t a project planned for design or construction. CDOT may be reached at 303.757.9011.
-
Share Hi - It was my understanding that Creekside Eagle Bend was being moved up to 2024 based on the extremely poor condition of our roads, especially come winter when the potholes all throughout our entrance get really bad. I was just looking at the 5 year map and see we are still scheduled for 2025. Can you please confirm if we were indeed moved up to 2024? And if you, do you know when the schedule will be posted? Thank you on Facebook Share Hi - It was my understanding that Creekside Eagle Bend was being moved up to 2024 based on the extremely poor condition of our roads, especially come winter when the potholes all throughout our entrance get really bad. I was just looking at the 5 year map and see we are still scheduled for 2025. Can you please confirm if we were indeed moved up to 2024? And if you, do you know when the schedule will be posted? Thank you on Twitter Share Hi - It was my understanding that Creekside Eagle Bend was being moved up to 2024 based on the extremely poor condition of our roads, especially come winter when the potholes all throughout our entrance get really bad. I was just looking at the 5 year map and see we are still scheduled for 2025. Can you please confirm if we were indeed moved up to 2024? And if you, do you know when the schedule will be posted? Thank you on Linkedin Email Hi - It was my understanding that Creekside Eagle Bend was being moved up to 2024 based on the extremely poor condition of our roads, especially come winter when the potholes all throughout our entrance get really bad. I was just looking at the 5 year map and see we are still scheduled for 2025. Can you please confirm if we were indeed moved up to 2024? And if you, do you know when the schedule will be posted? Thank you link
Hi - It was my understanding that Creekside Eagle Bend was being moved up to 2024 based on the extremely poor condition of our roads, especially come winter when the potholes all throughout our entrance get really bad. I was just looking at the 5 year map and see we are still scheduled for 2025. Can you please confirm if we were indeed moved up to 2024? And if you, do you know when the schedule will be posted? Thank you
Dana Morgan asked about 1 year agoUpdate as of Nov. 20, 2023: Public Works has notified me that following additional work on the 2024 plan and budget estimates, we can confirm that the streets in Creekside at Heritage Eagle Bend have been added to the 2024 plan. We continue to vet the plans with stakeholders (Aurora Water and other utility providers) to minimize project conflicts.
Thank you for reaching out. Currently, this area is not able to be incorporated into the 2024 overlay plan. The final plan for 2024 will be published closer to the project start early next year. Please report all potholes and concerns to Access Aurora at 303.739.7000 or AuroraGov.org/AccessAurora so we can continue to monitor the area while we prepare for future projects.
-
Share I just checked your Arterial Resurfacing Map for the Iliff Ave. Corridor and am concerned that the WORST section of Iliff Ave., from Parker to Havana is not going to be resurfaced this year! My concern rests upon the fact that the Arapahoe Co. portion of Iliff, west of Parker Road to W. of Quebec St. will be completed this fall and Aurora just completed the overlay from Havana St. East! This leaves a big blackeye right in the middle, just as you enter Aurora! I noticed that last year, you had construction crews repair the sidewalk and curb and gutter along this section of Iliff, but NO paving work has been done!!! Was this project scheduled for last year and then delayed due to the reconstruction project west of Parker? As a retired Project Manager/Resident Engineer for CDOT, I can understand the delay in resurfacing so as to match up with the new pavement and striping west of Parker. My question is, when are you going to repave this portion of E. Iliff Ave, and will it cross Parker to match up with the staggered end of new paving? This is the proper approach that should be done this fall! Please advise as this is critical to Aurora's image and the safety of traveling public. Dodging large pot holes and large cracks in the pavement does not result in the travelling public's safety! Sincerely, John K. Knop, P.E. 11053, Retired 2224 S. Eagle St. Aurora CO, 80014 on Facebook Share I just checked your Arterial Resurfacing Map for the Iliff Ave. Corridor and am concerned that the WORST section of Iliff Ave., from Parker to Havana is not going to be resurfaced this year! My concern rests upon the fact that the Arapahoe Co. portion of Iliff, west of Parker Road to W. of Quebec St. will be completed this fall and Aurora just completed the overlay from Havana St. East! This leaves a big blackeye right in the middle, just as you enter Aurora! I noticed that last year, you had construction crews repair the sidewalk and curb and gutter along this section of Iliff, but NO paving work has been done!!! Was this project scheduled for last year and then delayed due to the reconstruction project west of Parker? As a retired Project Manager/Resident Engineer for CDOT, I can understand the delay in resurfacing so as to match up with the new pavement and striping west of Parker. My question is, when are you going to repave this portion of E. Iliff Ave, and will it cross Parker to match up with the staggered end of new paving? This is the proper approach that should be done this fall! Please advise as this is critical to Aurora's image and the safety of traveling public. Dodging large pot holes and large cracks in the pavement does not result in the travelling public's safety! Sincerely, John K. Knop, P.E. 11053, Retired 2224 S. Eagle St. Aurora CO, 80014 on Twitter Share I just checked your Arterial Resurfacing Map for the Iliff Ave. Corridor and am concerned that the WORST section of Iliff Ave., from Parker to Havana is not going to be resurfaced this year! My concern rests upon the fact that the Arapahoe Co. portion of Iliff, west of Parker Road to W. of Quebec St. will be completed this fall and Aurora just completed the overlay from Havana St. East! This leaves a big blackeye right in the middle, just as you enter Aurora! I noticed that last year, you had construction crews repair the sidewalk and curb and gutter along this section of Iliff, but NO paving work has been done!!! Was this project scheduled for last year and then delayed due to the reconstruction project west of Parker? As a retired Project Manager/Resident Engineer for CDOT, I can understand the delay in resurfacing so as to match up with the new pavement and striping west of Parker. My question is, when are you going to repave this portion of E. Iliff Ave, and will it cross Parker to match up with the staggered end of new paving? This is the proper approach that should be done this fall! Please advise as this is critical to Aurora's image and the safety of traveling public. Dodging large pot holes and large cracks in the pavement does not result in the travelling public's safety! Sincerely, John K. Knop, P.E. 11053, Retired 2224 S. Eagle St. Aurora CO, 80014 on Linkedin Email I just checked your Arterial Resurfacing Map for the Iliff Ave. Corridor and am concerned that the WORST section of Iliff Ave., from Parker to Havana is not going to be resurfaced this year! My concern rests upon the fact that the Arapahoe Co. portion of Iliff, west of Parker Road to W. of Quebec St. will be completed this fall and Aurora just completed the overlay from Havana St. East! This leaves a big blackeye right in the middle, just as you enter Aurora! I noticed that last year, you had construction crews repair the sidewalk and curb and gutter along this section of Iliff, but NO paving work has been done!!! Was this project scheduled for last year and then delayed due to the reconstruction project west of Parker? As a retired Project Manager/Resident Engineer for CDOT, I can understand the delay in resurfacing so as to match up with the new pavement and striping west of Parker. My question is, when are you going to repave this portion of E. Iliff Ave, and will it cross Parker to match up with the staggered end of new paving? This is the proper approach that should be done this fall! Please advise as this is critical to Aurora's image and the safety of traveling public. Dodging large pot holes and large cracks in the pavement does not result in the travelling public's safety! Sincerely, John K. Knop, P.E. 11053, Retired 2224 S. Eagle St. Aurora CO, 80014 link
I just checked your Arterial Resurfacing Map for the Iliff Ave. Corridor and am concerned that the WORST section of Iliff Ave., from Parker to Havana is not going to be resurfaced this year! My concern rests upon the fact that the Arapahoe Co. portion of Iliff, west of Parker Road to W. of Quebec St. will be completed this fall and Aurora just completed the overlay from Havana St. East! This leaves a big blackeye right in the middle, just as you enter Aurora! I noticed that last year, you had construction crews repair the sidewalk and curb and gutter along this section of Iliff, but NO paving work has been done!!! Was this project scheduled for last year and then delayed due to the reconstruction project west of Parker? As a retired Project Manager/Resident Engineer for CDOT, I can understand the delay in resurfacing so as to match up with the new pavement and striping west of Parker. My question is, when are you going to repave this portion of E. Iliff Ave, and will it cross Parker to match up with the staggered end of new paving? This is the proper approach that should be done this fall! Please advise as this is critical to Aurora's image and the safety of traveling public. Dodging large pot holes and large cracks in the pavement does not result in the travelling public's safety! Sincerely, John K. Knop, P.E. 11053, Retired 2224 S. Eagle St. Aurora CO, 80014
John asked over 1 year agoThank you for reaching out. Iliff Avenue is on rotation for rehabilitation, but is not included in this year's project due to other rehabilitation needs across the city. All city roads are monitored every year for their condition and any unexpected deterioration. In 2024, the city will conduct a full network survey, which will define our rehabilitation priorities based on condition and needs throughout the city.
-
Share Did the city of aurora file an RFP with approved state contractor that went bid to complete this work for the city? on Facebook Share Did the city of aurora file an RFP with approved state contractor that went bid to complete this work for the city? on Twitter Share Did the city of aurora file an RFP with approved state contractor that went bid to complete this work for the city? on Linkedin Email Did the city of aurora file an RFP with approved state contractor that went bid to complete this work for the city? link
Did the city of aurora file an RFP with approved state contractor that went bid to complete this work for the city?
concerned about aurora city projects with no one in city reaching out to citizens asked over 1 year agoThank you for your inquiry. The city went through the full bid and approval process that included posting on Colorado Bid Network, reviewing all bids at a bid opening, and having the award decision approved by the City Council.
-
Share Hello! They just finished paving part of the street I live in and I was wondering how long until I can drive on the asphalt? on Facebook Share Hello! They just finished paving part of the street I live in and I was wondering how long until I can drive on the asphalt? on Twitter Share Hello! They just finished paving part of the street I live in and I was wondering how long until I can drive on the asphalt? on Linkedin Email Hello! They just finished paving part of the street I live in and I was wondering how long until I can drive on the asphalt? link
Hello! They just finished paving part of the street I live in and I was wondering how long until I can drive on the asphalt?
JG07 asked over 1 year agoThank you for reaching out. You should have received notification from the contractor in the form of a door hanger or similar that describes the work in more detail, including the duration of the project and how long parking restrictions are in force. There also should be a number to call if you have questions. If you did not receive a notification, please let me know.
-
Share It looks like the street repair in the Tollgate neighborhood in Aurora is done. The trucks and crews are all gone. However part of the street on E Bellwood Drive in Aurora doesn’t seem to be complete. From the front of my house at 24426 E Bellwood Drive east past three or four house to 24446 E Bellwood Drive only one half of the street is done. The street is about two inches below the far side of the street. It’s obvious when you look at it. Is it done or is someone coming back? on Facebook Share It looks like the street repair in the Tollgate neighborhood in Aurora is done. The trucks and crews are all gone. However part of the street on E Bellwood Drive in Aurora doesn’t seem to be complete. From the front of my house at 24426 E Bellwood Drive east past three or four house to 24446 E Bellwood Drive only one half of the street is done. The street is about two inches below the far side of the street. It’s obvious when you look at it. Is it done or is someone coming back? on Twitter Share It looks like the street repair in the Tollgate neighborhood in Aurora is done. The trucks and crews are all gone. However part of the street on E Bellwood Drive in Aurora doesn’t seem to be complete. From the front of my house at 24426 E Bellwood Drive east past three or four house to 24446 E Bellwood Drive only one half of the street is done. The street is about two inches below the far side of the street. It’s obvious when you look at it. Is it done or is someone coming back? on Linkedin Email It looks like the street repair in the Tollgate neighborhood in Aurora is done. The trucks and crews are all gone. However part of the street on E Bellwood Drive in Aurora doesn’t seem to be complete. From the front of my house at 24426 E Bellwood Drive east past three or four house to 24446 E Bellwood Drive only one half of the street is done. The street is about two inches below the far side of the street. It’s obvious when you look at it. Is it done or is someone coming back? link
It looks like the street repair in the Tollgate neighborhood in Aurora is done. The trucks and crews are all gone. However part of the street on E Bellwood Drive in Aurora doesn’t seem to be complete. From the front of my house at 24426 E Bellwood Drive east past three or four house to 24446 E Bellwood Drive only one half of the street is done. The street is about two inches below the far side of the street. It’s obvious when you look at it. Is it done or is someone coming back?
Walt Jankowski asked over 1 year agoThank you for your question. The street will have all milled areas get a new asphalt top layer. There is sometimes a delay between the removal and the new layer, but this is generally about a one week overlap in most areas.
-
Share The end of my driveway has the same curbs as the rest of the sidewalk/street and it's quite abrupt, it's not a smooth transition like you see in other neighborhoods. If the streets are getting redone, is it possible to have this driveway transition redone as well? on Facebook Share The end of my driveway has the same curbs as the rest of the sidewalk/street and it's quite abrupt, it's not a smooth transition like you see in other neighborhoods. If the streets are getting redone, is it possible to have this driveway transition redone as well? on Twitter Share The end of my driveway has the same curbs as the rest of the sidewalk/street and it's quite abrupt, it's not a smooth transition like you see in other neighborhoods. If the streets are getting redone, is it possible to have this driveway transition redone as well? on Linkedin Email The end of my driveway has the same curbs as the rest of the sidewalk/street and it's quite abrupt, it's not a smooth transition like you see in other neighborhoods. If the streets are getting redone, is it possible to have this driveway transition redone as well? link
The end of my driveway has the same curbs as the rest of the sidewalk/street and it's quite abrupt, it's not a smooth transition like you see in other neighborhoods. If the streets are getting redone, is it possible to have this driveway transition redone as well?
H asked over 1 year agoThank you for reaching out. Unfortunately, we can only do concrete repair work with our current scope and cannot change the driveway approach at this time.
-
Share Will streets be completely closed or if I park in driveway I can still come and go to work? on Facebook Share Will streets be completely closed or if I park in driveway I can still come and go to work? on Twitter Share Will streets be completely closed or if I park in driveway I can still come and go to work? on Linkedin Email Will streets be completely closed or if I park in driveway I can still come and go to work? link
Will streets be completely closed or if I park in driveway I can still come and go to work?
Phin asked over 1 year agoThank you for inquiring. Driveway access during the milling and paving operations is subject to the situation at the particular street and driveway. Please follow the parking guidelines distributed by the paving company for the duration of the operation. Each area is unique, but as a general guideline you can expect to park in your driveway after the milling operation, but may need to park elsewhere on the days that paving occurs. Again, please follow the directions distributed at your specific area. There will be a contact number listed on the doorhangers distributed and they will be able to answer in more detail as the time for your particular street approaches.
-
Share When is the is going to happen in Sorrel ranch? Where are we supposed to park? on Facebook Share When is the is going to happen in Sorrel ranch? Where are we supposed to park? on Twitter Share When is the is going to happen in Sorrel ranch? Where are we supposed to park? on Linkedin Email When is the is going to happen in Sorrel ranch? Where are we supposed to park? link
When is the is going to happen in Sorrel ranch? Where are we supposed to park?
Pattyj asked over 1 year agoThanks for inquiring. Based on the project tracker map, it looks like East Powers Avenue and East Brandt Avenue are a portion of the streets affected by the work this year, and that work should be in progress right now. The other work is happening on East Berry Avenue, South Buchanan Street and South Biloxi Way, but the work has not started yet. The contractor will contact all residents prior to work starting and provide instructions on parking. Please see the project tracker to view the scope of work for Sorrel Ranch and current status: https://giscityofaurora.azurewebsites.net/index.html.
-
Share I live in the Summer Lake neighborhood, we always have problems with drainage in the gutters. It always ices up in the winter, and there is standing water in the summer because the pitch is all wrong. Why do you put in a system for waste water?? on Facebook Share I live in the Summer Lake neighborhood, we always have problems with drainage in the gutters. It always ices up in the winter, and there is standing water in the summer because the pitch is all wrong. Why do you put in a system for waste water?? on Twitter Share I live in the Summer Lake neighborhood, we always have problems with drainage in the gutters. It always ices up in the winter, and there is standing water in the summer because the pitch is all wrong. Why do you put in a system for waste water?? on Linkedin Email I live in the Summer Lake neighborhood, we always have problems with drainage in the gutters. It always ices up in the winter, and there is standing water in the summer because the pitch is all wrong. Why do you put in a system for waste water?? link
I live in the Summer Lake neighborhood, we always have problems with drainage in the gutters. It always ices up in the winter, and there is standing water in the summer because the pitch is all wrong. Why do you put in a system for waste water??
Hutch asked over 1 year agoThank you for reaching out. At this time there is not a plan for additional stormwater drains in established neighborhoods. Please reach out to Aurora Water through Access Aurora at 303.739.7000 or AuroraGov.org/AccessAurora for further information from that department. In addition to snow control operations throughout the winter months, the Public Works Department's Streets Division offers to residents an ice cutting program as resources allow. The program is not to interfere with the Snow Control Plan but is considered as additional mitigation effort between snow events. Ice control operations are needed in many places throughout the city, especially when cold temperatures prevail through long stretches of time. Generally, ice buildup can be expected on the south side of roadways, in relatively flat areas, or where melted water has accumulated and has been prevented from flowing unimpeded to a storm water inlet or away from the area. Requests for ice mitigation are also made through the Access Aurora ticket system.
Follow Project
Lifecycle
-
Concrete Repair Contractor Procurement
Build Up Aurora has finished this stageAdvertising and hiring of contractors to complete concrete repair work will happen in August and September 2022.
-
Concrete Repair Work Begins
Build Up Aurora has finished this stageContractors started completing initial concrete repair work in February 2023, which is necessary in many cases before paving can occur. Additional concrete work will continue as needed during the paving process throughout the year.
-
Mill and Overlay Contractor Procurement Work
Build Up Aurora has finished this stageAdvertising and hiring of contractors for paving work will occur from January through March 2023.
-
Presentation of Final 2023 Rehabilitation Plan to City Council
Build Up Aurora has finished this stageThe final plan will be presented to the Aurora City Council in February 2023.
-
Mill and Overlay Construction Complete
Build Up Aurora is currently at this stageThe paving work began in spring 2023 to target residential streets in 35 neighborhoods, and the city was able to complete all of the work in 2023.
FAQs
- What does the initial street rehabilitation plan entail?
- How is the street maintenance work being funded?
- What are the definitions of the different types of street maintenance?
- Is this initial phase part of a larger plan?
- What kind of work is being completed?
- How should residents prepare for repairs on their streets (e.g., landscaping, rocks, sprinkler heads, etc.)?
- What can residents expect when repairs are being made on their street (road closures, home access, parking restrictions, doorhanger notices/timing, etc.)?
Fact Sheets and Presentations
- 2023 Neighborhood Meetings PowerPoint Presentation (16.6 MB) (pptx)
- Street Rehabilitation Terms and Definitions (355 KB) (pdf)
- Fiscal Responsibility and Stewardship (207 KB) (pdf)
- Responsabilidad fiscal y administración (Spanish) (334 KB) (pdf)
- 재정적 책임 및 관리 (Korean) (329 KB) (pdf)
- Trách nhiệm & Quản lý Tài chính (Vietnamese) (332 KB) (pdf)
- 财政责任和管理工作 (Chinese) (408 KB) (pdf)
- የበጀት ዓመት (ፊስካል) ኃላፊነት እና አስተዳደር (Amharic) (1.77 MB) (pdf)
- Funding Citywide Infrastructure Projects (519 KB) (pdf)
- Financiamiento de proyectos de infraestructura de la ciudad (Spanish) (799 KB) (pdf)
- 시내 인프라 자금 조성 프로젝트 (Korean) (634 KB) (pdf)
- Tài trợ cho Các Dự án Cơ sở Hạ tầng Toàn thành phố (Vietnamese) (629 KB) (pdf)
- 全市基础设施项目投资 (Chinese) (754 KB) (pdf)
- ከተማ አቀፍ የመሠረተ ልማት ፕሮጀክቶችን በገንዘብ መደገፍ (Amharic) (1.77 MB) (pdf)
Map of Project Areas
Key Dates
-
March 14 2023
-
March 30 2023
-
April 04 2023
-
April 06 2023
-
April 11 2023
Who's Listening
-
LC
Phone 303-326-8200 Email streets@auroragov.org -
Engineering Supervisor
NJPhone 303-326-8200 Email streets@auroragov.org
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends